Awedio.sg is now part of the SPH Media website.

Southeast Asia Data Center Construction Industry Outlook Report 2026: Investments are Expected to Grow at a CAGR of 17.83% During 2025-2031, Driven by Attraction from Major Operators

The issuer is solely responsible for the content of this announcement.

Published by SPH Media Limited, Co. Regn. No. 202120748H. Copyright © 2026 SPH Media Limited. All rights reserved.